| Construction code for new work and alterations | IRC, through the construction code's one- and two-family subcode. A construction permit for most electrical, plumbing, structural, and mechanical work. | IRC for one- and two-unit rentals; IBC for buildings with three or more units. Construction permit with fire-protection subcode review. | IBC by use group (assembly, business, educational, factory, institutional, mercantile, storage, and so on). Construction permit with fire-protection subcode review. |
| Uniform Fire Code | Does not apply while owner-occupied. | Applies once neither unit is owner-occupied, and to every building with three or more units. | Applies. |
| Registration | None. | Landlord registration with the municipality (one and two units) or the state Bureau of Housing Inspection (three or more). The fire official's non-life-hazard registration where the local ordinance covers apartment buildings. | Non-life-hazard registration with the municipality, or Life Hazard Use registration with the state when the use is on the state list. |
| Periodic fire inspection | None. The smoke-alarm, CO-alarm, and extinguisher certificate is checked at sale. | Local fire official on the local cycle for the common areas; the state's multi-year cycle for buildings with three or more units; HUD NSPIRE for public and assisted housing; local rental inspection at turnover in many towns. | Annual on the typical local cycle for non-life-hazard uses; the state's cycle for Life Hazard Uses, quarterly for Type C. |
| Smoke and CO alarms | Required; certified by the fire official at sale. | Required in every unit, maintained by the owner, certified at each change of occupancy. Hard-wired or interconnected systems where the building's construction permit required them. | A fire alarm system where the use group and size require one, with detection, inspection, and testing under NFPA 72 and the records to prove it. |
| Portable extinguishers | One in the kitchen area, checked at sale. | Kitchen-area unit in one- and two-family rentals at change of occupancy; common-area units placed and tagged under NFPA 10 in larger buildings. | Required throughout by count, class, and travel distance under NFPA 10, tagged annually by a permitted contractor, checked monthly. |
| Emergency lighting and exit signs | Not required. | Required on the common egress path in larger buildings, tested monthly and annually. | Required on every egress path, tested monthly for 30 seconds and annually for 90 minutes, with the log kept. |
| Fire doors, sprinklers, hood systems | Not applicable. | Rated stair and corridor doors in buildings with three or more units, inspected annually; sprinklers and standpipes where the construction permit required them, tested under NFPA 25. | By use: kitchen hood suppression semiannually, sprinklers under NFPA 25, fire doors under NFPA 80, each with its own inspection cycle and report. |
| Permits for operations | Construction permit only. | Construction permit; a fire permit for hot work, open flame, tents, or similar operations on the property. | Construction permit, plus the fire official's permits for listed operations such as hot work, spray finishing, hazardous storage, and assembly events, some renewed annually. |
| What a violation costs | The sale cannot close without the certificate. | Fire-code and housing-code penalties assessed per violation, orders to correct, and, for public housing, a lower inspection score. | Fire-code penalties per violation, per day until corrected, orders to vacate, and, for licensed facilities, survey findings that reach the license or the payment. |